Skip to main content
ERC
ERC
ERC
ERC
ERC
ERC

MEP for Recovery Center

Farnsworth Group provided mechanical, electrical and plumbing engineering services for a 123,500 SF eating recovery clinic in Lowry. 

The 72-bed inpatient facility includes a lobby, reception area, support spaces and a kitchen on the ground floor. The second and third floors contain offices, support areas, restrooms and dining facilities.

The mechanical and plumbing scope of this project included designing connections to the core and shell building heating water piping distribution, as well as the domestic cold and hot water systems.

Our electrical team coordinated with the Owner's IT Department to provide plans with voice/data rough-ins and conduit design for tenant spaces. They also designed lighting, panel sizing, feeders, schedules and branch circuits. To comply with the City and County of Denver's Code requirements, we performed commissioning services for the mechanical, electrical power, lighting controls and hot water systems.

Lowry Eating Recovery Center - Station